Tuesday, May 6, 2008

Monday May 5, 2008


Daily Project Report
Weather: Warm and Windy
Temperature: 80 degrees
Work Completed Today:


Poured more mud slab for the collection tunnel. Started tying floor steel for collection tunnel. fabricated bar and stocked by in place. Built blockout forms for the trenches in the floor. Received permission to continue with collection tunnel.

Also built a plan table in the tool crib. Will put up pictures of that tomorrow.


The pictures are as follows: Cody keeping the air pump from bouncing out of the water tank. Watering down the dirt for the pour. Using the chute we built for the pour.








Also a view of the floor steel, our state of the art wheelbarrow and cleaning up the tools in the sump pit.